Electrical Installation Condition Report (EICR)
The five-yearly electrical safety report every private landlord in England must have, what it has to say, when tenants must be given a copy, and what the council can do when a landlord doesn't comply.
How often does a private landlord need an EICR?
At least every five years, or sooner if the previous report sets a shorter interval. The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 have applied to new tenancies since 1 July 2020 and to all existing private tenancies in England since 1 April 2021. The inspection and test must be done by a qualified and competent person, and the report must say whether the installation is satisfactory.
When must my landlord give me a copy of the EICR?
Within 28 days of the inspection if you're an existing tenant; before you move in if you're a new tenant; and within 28 days of a written request if you're a prospective tenant. The landlord must also give a copy to the local council within seven days of a written request from them. If remedial work was needed, you should get written confirmation it's been done within 28 days of it being completed.
What do the codes C1, C2, C3 and FI mean?
They're the classification codes electricians use on the report. C1 means danger is present and immediate action is needed. C2 means potentially dangerous and urgent remedial work is required. FI means further investigation is needed without delay. C3 means improvement is recommended but not required. A report with any C1, C2 or FI observation is unsatisfactory and the landlord must have the work done within 28 days or any shorter period the report specifies. C3 items alone don't make the report unsatisfactory.
Can I withhold rent if there's no valid EICR?
Withholding rent is risky: it puts you in arrears, which can be a ground for possession, and the regulations don't give tenants a right to stop paying. The enforcement route is the local council, which can serve a remedial notice, arrange the work itself and recover the cost, and impose a financial penalty of up to £30,000 per breach. Report the problem to the council's private sector housing team in writing and keep a copy.
Does the EICR requirement apply to HMOs and lodgers?
Houses in multiple occupation are covered by the 2020 Regulations in the same way as other private tenancies; the separate HMO licensing condition about electrical safety was replaced by these rules. Lodger arrangements where you share a kitchen, bathroom or living room with the landlord or their family are excluded, as are social housing tenancies, long leases of seven years or more, student halls, hostels, refuges, care homes and hospitals.
Does a missing EICR affect my landlord's right to evict me?
Not directly. Unlike the gas safety certificate and the old How to Rent guide, the EICR was never a condition of serving a section 21 notice, and since 1 May 2026 section 21 no longer exists for assured tenancies in England. A landlord without a valid EICR faces council enforcement and a penalty, and the failure may be relevant evidence in a dispute about the condition of the property, but it doesn't by itself stop a possession claim on a valid ground.
What the landlord must do
- 1 Inspect and test every five years. The fixed installation must be inspected and tested by a qualified and competent person at intervals of no more than five years, or sooner where the last report says so. The standard applied is the 18th edition of the IET Wiring Regulations (BS 7671).
- 2 Get a written report. The report must give the results and the date of the next inspection. It is "satisfactory" or "unsatisfactory"; any C1, C2 or FI observation makes it unsatisfactory.
- 3 Fix what the report requires. Remedial or further investigative work must be completed within 28 days of the inspection, or any shorter time the report specifies, and written confirmation given to the tenant and the council within 28 days of the work finishing.
- 4 Hand out copies. Existing tenants within 28 days of the inspection; new tenants before they occupy; prospective tenants within 28 days of a written request; the council within seven days of a written request. Keep a copy until the next inspection and give it to the next inspector.
Which tenancies are covered
The regulations apply to a tenancy of residential premises in England that grants one or more people the right to occupy as their only or main residence and pays rent, which covers almost every private assured tenancy. Schedule 1 excludes:
- tenancies where the landlord is a private registered provider of social housing;
- lodgers and others who share a kitchen, bathroom or living room with the landlord or the landlord's family;
- long leases, and tenancies granting a right to occupy for seven years or more;
- student halls of residence;
- hostels and refuges meeting the Schedule's conditions, care homes, hospitals and hospices, and certain NHS accommodation.
Houses in multiple occupation are included. The regulations replaced the old HMO licensing condition on electrical safety with the same five-year duty. Scotland and Wales have their own regimes with similar five-year intervals but different enforcement.
Enforcement and penalties
Enforcement sits with the local housing authority, not with the tenant or the courts. If the council has reasonable grounds to believe a landlord is in breach, it must serve a remedial notice within 21 days requiring the work within 28 days. If the landlord doesn't comply, the council may, with the tenant's consent, arrange the work itself and recover the cost from the landlord. Separately, it may impose a financial penalty of up to £30,000 for each breach, after serving a notice of intent and considering representations. Landlords can appeal a penalty to the First-tier Tribunal (Property Chamber).
Urgent remedial action is handled faster: where a report identifies immediate danger and the landlord fails to act, the council can arrange the work itself without waiting for the full 28 days.
For tenants, the practical route is a written report to the council's private sector housing team with a copy of any correspondence asking the landlord for the report. A council inspection may also pick up hazards under the Housing Health and Safety Rating System, which has its own enforcement powers.
A landlord's electrician inspects a flat on 2 February and issues an unsatisfactory report: one C2 observation for a damaged socket and one C3 recommendation to add RCD protection to the lighting circuits. The landlord replaces the socket on 18 February and gets written confirmation from the electrician the same day.
Report copy due to existing tenant
C2 remedial work deadline
18 February — in time
Confirmation of work due to tenant and council
Next inspection due by
2 February, five years on
The C3 item is a recommendation only and doesn't have to be done to make the installation compliant, though many landlords do it at the same time. Had the C2 socket still been unrepaired on 3 March, the landlord would be in breach and the council could serve a remedial notice and consider a penalty of up to £30,000.
Gas safety certificate
Energy Performance Certificate (EPC)
Civil penalty (housing)
Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 (SI 2020/312)
Electrical safety standards in the private and social rented sectors: guidance
Housing and Planning Act 2016, sections 122 and 123
Electrical Installation Condition Report (EICR) — Renters' Rights Glossary
What an EICR is, the five-year rule for private landlords in England, the 28-day deadlines for copies and remedial work, which tenancies are excluded, and the £30,000 council penalty for non-compliance.